Construction


Individual Production Log (Dates)

27/2/12
Today myself and my groupd had a chance to discuss the different ideas in which we could/would use in both our pre-lim task and main. This then gave us the opportunity to figure out the different aspects and features that we would like to include. for instance we had written up a script to use for our prem-lim and where abouts that we was going to film it (College corridoor), aswell as drawing up a story board so that we are able to identify and establish what different shots that we are going to use and what they might look like so that if we feel that it doesn't flow/look right we can change it to make it more suited to what we would want to see. As we are focusing on the pre -lim first we did not need to go in depth about what we would like to do for our main task yet however we still brainstormed some ideas on the matter so that when we had come to deciding we would have a better idea of what we wanted to get from it.

28/2/12
 Today my group once again gather togother so that the ideas that we were able to discuss previously we were able to effectively prepare for our pre-lim. Therefore we had discussed the different roles that memebers of our group would do when looking to achieve this task to the best of our ability.As we finished this is quite quickly we decided to start working on what we would need to prepare for on our main task and therefore started collecting the ideas togther that we had gained previously and started making them more realist and something that we can aim to achieve e.g. the potential story line,
deciding upon the different areas in which we would want to locate it. Then i specially went and wrote a prop list so that we would know all the different things that we will need when filming the sequence aswell as drawing up the story boards as other members of my group has had different tasks e.g. costume list, script and  picture of loactions.

2/3/12
we has been able to finilise all the ideas that we had  come with and finished with almost everything that we would need to do in preperpartion of actually recording out main task. We have done a high amount oft he preportation and therefore discussing different appropriate times in which we would all be able to travel to these locations and film the sequence.As we will be wanted to use the dark room within college as part of a different scene in out opening credits we had to decide on a different day which we would all have some free time abd be able to record this scene on sight of the college's premisis.This is so that we know what we will all be doing and what will need to be done so that we will be able to do it efficiently to get the highest grade that we could.
11/3/12
Today my group had the opportunity to get the camera so that we are able to film the first part of our final piece of coursework ( opening to the thriller film) we had first talked about starting to film in greenwich because of the setting that there is around greenwich and the different things we would be able to get from using this specific location. For example becuase it is in a public place it makes the setting of the opening more realistic than it would if we was out filming in the middle of the day with no one at all in the surroundings.We then moved on to the second part of our filming were we recording the main part of the whole opening, to make sure that this came out right we waited for it to get abit darker so that it would bring more effect to our opening.

15/3/12
Today myself and my group was able to do the editing and filming which we needed to do for out pre-lim task. during this we all took turns to do a part of the the different things that was needed in order to make sure that everything was completed efficient and to a good standard. we all discussed what different cuts and transitions that we thought might look good on different shots and whether there was anything that needed to be cut out or if we missed out some of our shots what we would need to do in order to complete it.


Photographs from filming





















No comments:

Post a Comment